ActiveREQ-000021
Engineering Data Acquisition
Seeking engineering data from companies that design or manufacture physical products, components, assemblies, and tooling. Complete, connected design-to-manufacturing packages from products that have entered production are strongly preferred, including testing, quality records, and revision history. Partial datasets and standalone files are also welcome.
- Data type
- Engineering design-to-manufacturing project data
- Volume
- Suppliers should report the approximate available data volume in their inventory.
- Delivery date
- Not specified
Requirement brief
Specific requirements
- Product and design: Requirements, specifications, and bills of materials (BOMs).
- Product and design: Native CAD, assemblies, drawings, tolerances / GD&T, and design concepts.
- Engineering history: Design decisions, change logs / ECOs, revision history, and relevant project communications.
- Manufacturing: Native CAM / slicer projects and CNC programs, including G-code and M-code.
- Manufacturing: Setup and process records; machine, tool / holder, stock, fixture, coordinate, and post-processor definitions.
- Manufacturing: Complete operation sequences and verification of collisions, remaining stock, and overcuts.
- Manufacturing: Project status and known omissions or issues.
- Testing and quality: Test results and raw data; inspection / CMM reports; DFMEA / PFMEA; and production or field failures.
- Supporting records: Product photos and videos, service and maintenance logs, and relevant engineering notes.
- Supplier overview: Capabilities, headcount, and years of operation.
- Data inventory: Project types, file formats, approximate volume, software, and machines.
- Representative sample: Preferably one connected CAD-to-manufacturing project, with supporting records.
- Preserve folder structure and dependencies. Note omissions and any additional data available.
Coverage
Required coverage
- Physical products, components, assemblies, and tooling
- Preferred: Complete, connected design-to-manufacturing packages from products that have entered production
- Testing, quality records, and revision history within connected production packages
- Partial datasets and standalone files are also welcome
Interested in this requirement?
Review the supplier process and prepare your capabilities.